Tub to Shower Conversion in Calgary: Walk-In Showers in Five Stages
Delta Home Remodeling converts a bathtub to a walk-in shower in Calgary in 5 stages: the tub comes out, a waterproofed shower base and walls go in, the drain and valve are installed on a City of Calgary plumbing permit, the enclosure is tiled, and a glass panel or door is fitted. The plumbing permit applies because the drain and valve change (City of Calgary, 2026); the $205.92 CAD building permit applies only when a wall or window moves. Nim Fetiu, the owner, quotes every conversion in writing.

- Google rating
- 4.9 out of 5 from 33 reviews, November 2026
- Owner and your contact
- Nim Fetiu
- Address
- 207 Panamount Gardens NW, Calgary, AB T3K 5V3
- Page updated
- November 2026
Nim Fetiu reviews your photos and sends a written, itemized quote.
Send photos and the rough size of the space to Delta Home Remodeling, 207 Panamount Gardens NW, Calgary, AB T3K 5V3, or call (587) 434-7066.
Request a quoteMonday to Saturday, 8 a.m. to 5 p.m. Closed Sunday.
A tub to shower conversion in Calgary needs a City of Calgary plumbing permit, because the drain and the valve change, and a $205.92 CAD building permit (2026 fee) only when a wall or window moves. Delta Home Remodeling, the general contractor behind bathroom renovations in Calgary, converts a bathtub to a walk-in shower in 5 stages: the tub comes out, a waterproofed base and walls go in, the drain and valve are installed on the permit, the enclosure is tiled, and a glass panel or door is fitted.
Delta Home Remodeling converts tubs to showers in ensuites, main bathrooms and basement bathrooms across Calgary, with Nim Fetiu, the owner, as the one contact from the written quote to the walkthrough. Delta holds a 4.9 out of 5 rating on Google from 33 reviews as of November 2026.
What a Delta tub to shower conversion in Calgary includes
A Delta Home Remodeling tub to shower conversion in Calgary covers 10 items under one written quote, from the tub removal to the glass.
- Tub removal and disposal, with the subfloor and the wall framing checked for water damage before anything new goes in
- Waterproofing membrane on the base and the walls, continuous into the niche and the bench
- Shower base: an acrylic base, a tiled base with a curb and centre drain, a tiled base with a linear drain, or a curbless base
- Drain and valve installed on the City of Calgary plumbing permit, with a pressure-balanced or thermostatic valve set so the water cannot exceed 49°C
- Wall tile or panels, with a recessed niche and a bench where the alcove allows
- Fixtures: rain head, hand shower and controls, in the finish you choose
- Glass: a fixed panel, a sliding door or a hinged door, measured after the tile is in
- Exhaust fan checked or replaced and vented outside, on an electrical permit when a new circuit is needed
- Paint and trim around the new enclosure
- Permits and inspections: Delta files the plumbing permit, the electrical permit when it applies, and the building permit when a wall or window moves, and books the inspections
Four ways to build the shower base in a Calgary conversion
Four base types cover the Calgary tub to shower conversions Delta Home Remodeling builds, and the base decides the cost, the look and who can step in: an acrylic base is the quickest, a tiled base with a curb is the standard, a linear drain lets large tiles run to the drain, and a curbless base removes the step. The table says what each base is and who it suits, as Delta quotes them in November 2026.
| Base type | What it is | Who it suits |
|---|---|---|
| Acrylic base with tiled or panelled walls | A factory base set in the old tub alcove, drain at the factory location | Budget conversions, rental and basement bathrooms |
| Tiled base, curb and centre drain | A sloped mortar bed under the membrane, small floor tile to a centre drain | Most ensuites and main bathrooms |
| Tiled base with a linear drain | A single slope to a long drain at the back wall or the threshold, so large-format tile runs onto the floor | Ensuites with large tile and a bench |
| Curbless base | The base is recessed into the floor framing or the floor is sloped, no step | Aging in place, wheelchair access, small bathrooms that need to look bigger |
Delta prices the base type as its own line on the written quote, so moving from acrylic to a tiled or curbless base changes one number.
City of Calgary rules that apply to a tub to shower conversion (2026)
Four City of Calgary rules apply to a Calgary tub to shower conversion in 2026, and the plumbing permit is the one every conversion triggers: a plumbing permit because the drain and valve change, an electrical permit when a heated floor, fan circuit or light is added, the $205.92 CAD building permit only when a wall or window moves, and a plumbing final inspection that checks the shower water cannot exceed 49°C. The table gives each rule as the City of Calgary publishes it, accessed November 2026.
| Rule | Requirement (City of Calgary, 2026) |
|---|---|
| Plumbing permit | Required for all new plumbing and for extending or altering existing plumbing, which includes moving the drain and replacing the valve; swapping a faucet in place needs none |
| Electrical permit | Required for all electrical installations and renovations, such as a heated floor, a new fan circuit or a new light in the shower |
| Building permit | Required only for structural changes such as moving walls and for new or relocated windows; $205.92 CAD, about 7 days of review |
| Plumbing final inspection | Tub and shower water must not exceed 49°C, and every toilet needs a shut-off valve |
Every Delta conversion in Calgary gets a continuous waterproofing membrane, an exhaust fan vented outside, and caulked joints at the glass, the curb and the floor, because Calgary’s dry winter air, with the furnace running from October to April, pulls moisture through any gap in a shower wall.
How Delta converts a tub to a shower in Calgary: five stages
Delta Home Remodeling converts every Calgary tub to a walk-in shower in 5 stages, from the written quote to the walkthrough where you confirm the shower is complete.
- Get the written quote and make the selections. You send photos and measurements of the tub alcove, or book a visit. Nim Fetiu sends an itemized quote with the base type, tile, glass, fixtures and permits on separate lines. Tile, base and fixtures are ordered before demolition, and Delta files the City of Calgary plumbing permit and any electrical or building permit.
- Remove the tub and rough in. The tub, surround and wet drywall come out. The subfloor and framing are checked and repaired. The drain moves to the centre, the back or the threshold, the new valve goes in, and the rough-in inspection passes before any wall closes.
- Waterproof and build the base. Cement board or a foam board goes on the walls, the base is formed, and the membrane goes on continuously across the base, the walls, the curb, the niche and the bench. Delta checks the membrane before tile.
- Tile. The walls, base, niche and bench are tiled, grouted and sealed, and the fixtures are installed. The glass is measured once the tile is in.
- Fit the glass and walk through. The panel or door is installed, the joints are caulked, the fan and paint are finished and Delta books the final inspection. You inspect the finished shower with Nim and run the water. You confirm the shower is complete by checking 3 things: every item on the quote is installed, the drain takes the water with no pooling and no leak at the glass or the curb, and the touch-ups from the walkthrough are done.
How Delta files the permit and schedules inspections for your conversion
Delta Home Remodeling files the City of Calgary plumbing permit before the tub comes out, adds the electrical permit when a heated floor, fan circuit or light is on the quote, and adds the $205.92 CAD building permit only when a wall or window moves. The rough-in inspection is booked for the day the drain and valve are in and before the walls close, and the final inspection after the glass, so the schedule in the written quote shows both dates. The City’s fees sit on their own lines on the quote, separate from the base, tile, glass and labour.
How to choose the base, glass and tile for your Calgary conversion (2026)
Delta Home Remodeling picks the shower for a Calgary conversion by 3 questions: who steps into it, how big the alcove is, and how long you plan to stay in the house.
When an acrylic base and a sliding door are enough
An acrylic base with tiled or panelled walls and a sliding door is enough for a Calgary basement or rental bathroom, or a main bathroom that gets light use, because it gives a watertight shower in the standard alcove at the lowest cost on the quote.
When a tiled base, linear drain and bench are worth it
A tiled base with a linear drain, a bench and a frameless glass panel is worth it in a Calgary ensuite you use every day, because large-format tile runs from the wall onto the floor, the bench and niche add storage and seating, and the glass panel keeps the room open, as in the December 2024 ensuite in the photos on this page.
When to go curbless
Go curbless when anyone in the house will need step-free access in the years you plan to stay, or when the bathroom is small enough that a curb and a door make it feel smaller. Delta checks the floor framing at the quote stage, because a curbless base needs depth to recess or slope the floor.
Fixtures, tile and items outside a Delta tub to shower quote in Calgary
Three kinds of item sit outside a Delta Home Remodeling tub to shower quote in Calgary unless the quote names them: fixtures, tile and glass you buy yourself, which Delta installs with the installation as its own line; the vanity, toilet and floor outside the shower, which Delta quotes as a bathroom renovation when you want them done together; and work in other rooms. Delta does not include roofing, exterior work or new home construction in a bathroom contract.
Who hires Delta Home Remodeling for tub to shower conversions in Calgary
Homeowners across Calgary hire Delta Home Remodeling to convert a tub to a walk-in shower in the ensuite most often, then in a basement bathroom, and in the main bathroom when a second tub stays elsewhere in the house. Delta holds a 4.9 out of 5 rating on Google from 33 reviews as of November 2026. Nim Fetiu owns Delta Home Remodeling, quotes the conversion and runs the plumbing, tile and glass trades under one schedule. The office of Delta Home Remodeling is at 207 Panamount Gardens NW, Calgary, AB T3K 5V3, and the phone number is (587) 434-7066.
Delta Home Remodeling itemizes the tub removal, the base, the waterproofing, the tile, the glass, the fixtures and the City of Calgary permit on the written quote, so you compare its price line by line with other Calgary shower companies. Call (587) 434-7066 or request a written quote. A conversion that also moves the vanity or a wall is quoted as a full bathroom renovation in Calgary.
7 questions Calgary homeowners ask about tub to shower conversions
Delta Home Remodeling answers the 7 questions Calgary homeowners ask most, each with the number, rule or step behind it.
A tub to shower conversion in Calgary needs a City of Calgary plumbing permit, because the drain and the shower valve are altered, and an electrical permit if a heated floor, a new fan circuit or a new light goes in (City of Calgary, 2026). The $205.92 CAD building permit is needed only when a wall or a window moves. Delta Home Remodeling files the permits and books the inspections.
A Calgary tub to shower conversion by Delta Home Remodeling runs on a written schedule set by 3 things: the base type, the tile and glass lead times, and the City of Calgary inspection dates. The rough-in inspection happens before the walls close and custom glass is measured after the tile is in, so the glass lead time sits at the end. Nim Fetiu gives you the construction dates in the written quote.
Tub to shower conversion cost in Calgary depends on 5 things in a Delta Home Remodeling quote: the base type (acrylic or tiled, curb or curbless), the wall tile and its layout, the glass (fixed panel, sliding or hinged door), the fixtures, and whether the vanity, toilet and floor are redone in the same job. Send photos and measurements of the tub alcove and Nim Fetiu gives you a written, itemized quote.
The shower goes where the tub was in most Calgary conversions, in the same 60 by 30 or 60 by 32 inch alcove, with the drain moved from the tub end to the centre or to a linear drain at the back or the threshold. That drain move is plumbing work on the City of Calgary plumbing permit; it does not need a building permit because the walls stay put.
Delta Home Remodeling builds curbless walk-in showers in Calgary when the floor framing allows the shower base to be recessed or the floor to be sloped to a linear drain. A curbless shower suits aging in place and wheelchair access, and needs a wider glass panel or a splash zone planned so water stays in the shower.
Keeping one bathtub in a Calgary house is the usual advice for families with small children and for resale, so Delta Home Remodeling most often converts the ensuite or the basement bathroom to a walk-in shower and leaves the main bathroom tub. In a one-bathroom home, Delta talks the choice through at the quote stage.
Three things stop a converted Calgary shower from leaking: a continuous waterproofing membrane behind the tile on the base and the walls, a drain and valve installed and inspected on the City of Calgary plumbing permit, and caulked joints where the glass, the curb and the floor meet. Delta Home Remodeling checks the membrane before any tile goes on.
City of Calgary pages used for the rules on this page, accessed November 2026:
- City of Calgary, Home renovations and basements: when plumbing, electrical and building permits apply, 2026 fee schedule and review timelines (www.calgary.ca/development/home-building/basements.html)
- City of Calgary, Legalize an existing secondary suite: plumbing inspection requirements (49°C maximum tub and shower water temperature, shut-off valves) (www.calgary.ca/development/home-building/existing-secondary-suite.html)
Get a written quote for tub to shower conversions in Calgary
A tub to shower conversion in Calgary by Delta Home Remodeling is 5 stages, tub out, waterproofed base and walls, drain and valve on a City of Calgary plumbing permit, tile, glass, with the $205.92 CAD building permit added only when a wall or window moves. Send Nim Fetiu photos of the tub alcove and its measurements, and you get a written quote with the base type, the tile, the glass and the permit on separate lines.
Delta Home Remodeling, 207 Panamount Gardens NW, Calgary, AB T3K 5V3. Office hours: Monday to Saturday, 8 a.m. to 5 p.m. Closed Sunday. Photos of the space get you a faster, more accurate quote.
This page is part of Bathroom Renovations in Calgary, one of the 6 Delta Home Remodeling services.
- Read next: Legal basement suite requirements in Calgary.
Start at the Delta Home Remodeling home page.